Company News
Company News
- The brand of hyperbolic aluminum veneer is up to the customer
- What are the main application space of punching aluminum veneer
- How to choose fluorocarbon aluminum veneer manufacturers
- Installation of aluminum veneer
- What are the measures taken for summer maintenance of carved aluminum aluminum alloy air conditioning cover
Industry dynamics
- Curved aluminum veneer with complex process
- Causes of color difference in aluminum veneer
- What is special about the production of curved aluminum veneer
- Aluminum curtain wall can protect the exterior wall in the building
- Deficiencies of hyperboloid aluminum veneer mold opening
FAQ
- How to store the carved aluminum plate after processing
- How to choose high-quality aluminum alloy air conditioning cover
- The difference between single aluminum veneer and hyperbolic aluminum veneer
- What are the storage environments for wood grain aluminum veneer
- What are the advantages of imitation wood grain aluminum veneer
Contact Us
Mobile phone: 13074271912
Tel: 130-7427-1912
Email: 3457334962@qq.com
Address: Jianmei Building, Dali Town, Nanhai District, Foshan City, Guangdong Province, China
Company News
Aluminum veneer installation method
- Author: Kaimai
- Release date: 2021-09-16 11:51:21
- 点击:0
(I) the line, fix the steel frame, and bounce the position of the frame to the base. The skeleton is fixed on the main structure, and the quality of the main structure shall be checked before setting out.
(II) the connector of the fixed frame, and weld the connector on the column of the main structure to fix the frame.
(III) and fix the skeleton, and carry out anti-corrosion treatment after the skeleton is welded. The installation position of the skeleton is accurate and the structure is firm. Check center line, surface elevation, etc. after installation. In order to ensure the installation accuracy of the plate, it is advisable to use theodolite to penetrate the mullion rod of the beam.
(IV) installation of aluminum veneer, aluminum veneer installation fixed to be solid and reliable, simple and easy.
1. The gap between the board and the board should be internally treated to make it flat and smooth.
2. After the aluminum veneer is installed, cover and protect the parts that are easy to be contaminated with plastic film or other materials.